Lintel Repairs East London
Newman’s were called upon to provide their specialist rapid response services to a private home owner who had recently had load bearing timber windows removed and replaced with non load bearing uPVC windows leading to a failed brick arch lintel failure.
A survey was carried out indicating that the extent of the lintel failure was severe and required stabilisation by the introduction of bed joint reinforcement combined with resin injection to create load bearing beams within the masonry and stabilise the lintels.
Two masonry beams were installed between each window opening to alleviate the structural loads from the failed brick arches and restoring the aesthetics.
The project was completed on time and within the agreed budget providing a guaranteed permanent repair.