Cracked Lintel Repair Survey
One of our first survey’s of the week to this listed property in the high street of Maidenhead, Windsor.
The brick tower is suffering from lintel failure and the flank elevation has bowed and cracked due to lateral movement following the demolition of the neighboring building.
The brick lintels will be reinforced using Twistfix helical bars and Twistfix 450mm CD dryfix pinning ties, the lateral movement will be stabilised using Twistfix lateral restraint ties install in to the existing parallel floor joists along the flank elevation.
Following the structural repairs the new development works will continue as planned, to find out how we can help with your building and structural repair needs contact our head office on 0333 444 0154 or email us enquiries@newmans.com