Bowing Walls!

Help my building is bowing!

That phrase is commonly heard within the Newman’s office, being a common problem to Victorian and Edwardian built properties we are able to offer modern methods of structural repair to prevent and restrain outward movement.

Bowing House in Need of Restraint

Bowing walls are caused by a lack of lateral restraint, which allows the masonry panels to move independently often outwards severely weakening the structural integrity of the property.

This is often evident at the levels of the masonry where the floor joists run in accordance to the floor and ceiling joists. Tying into the floor and ceiling joists is essential in repairing and restraining the movement and traditional tie bars which are visible on many period properties are no longer required.

Lateral Restraint Ties

Newman’s utilise the Twistfix Heliforce system providing lateral restraint by inserting 1.0m, 1.5m or 2.0m ties into the floor and ceiling joists with a resin fix into the brick work providing an almost invisible repair once aesthetic brick repairs have been carried out. Incorporating lateral restraint ties with helical bar creating deep masonry beams and replacement wall ties remove the need for expensive intrusive and dangerous remove and rebuild techniques that may have been previously used.

Read More

Residential Victorian Properties Part 1

Residential Victorian Properties and how they were constructed.

The style of Victorian properties varies across the country and the main focus of this article is those properties built in the South East and London.

The general era defined by the Victorian period of rule is of 1830’s to early 1900’s and it was an era that changed the face of Britain’s house building. With the industrial revolution introducing innovative techniques and rapid economic growth leading to a boom in domestic, commercial and industrial property building.

The Victorian era of house building led the revival of many previously popular styles of architecture and incorporated these styles that define the Victorian era. Houses were a sign of status and the more wealthy the owner the more elaborate the property, incorporating elegant fascia boards and dog teeth brickwork and high brick built chimneys and large bay windows.

The exterior of the property was usually built using solid wall construction using yellow stock bricks laid in a 1 sand and 1 lime mortar mix in a Flemish bond. Flemish bond is a strong bond but the typical mortar mix used is a fairly weak mix with a high permeability to moisture absorption. There is a benefit in using a fairly weak mix with lime in the mix as this allows the structure to withstand a fair amount of structural movement which is why movement joints aren’t found amongst period properties and often aren’t required. The cause for a large proportion of external cracking within the exterior of period properties is caused by common factors such as lintel failure, outward movement causing lateral instability and ground movement causing subsidence and heave.

Internally the structure is commonly found to have 9 inch solid brickwork for load bearing masonry partition walls and lathe and plaster separating walls both of which are strong and allow some amount of structural movement.  Ceilings are often very high and found with intricate internal plasterwork, decorative mouldings and joinery.

The Victorians also installed large timber sash windows that are often load bearing and upon replacement, with non-load bearing uPVC windows, causing lintel failure. The elaborate brick arch lintels often fail upon removal of the timber windows and doors as they are often left unsupported, allowing them to sag causing the brick work and mortar to crack in a common stepped cracking. With stair cases usually running parallel to the external flank and gable walls Newman’s usually find that there are no ties from the external wall into the floor joists or stair case. This allows the flank or gable wall to act freely leaving a lateral instability but with the skill and knowledge our surveyors have we are able to restrain this movement using the innovative Twistfix helical bar creating masonry beams combined with Twistfix lateral restraint ties.

Victorian foundations differ dramatically from Modern structures that are usually built on large foundations typically on concrete ground beams or reinforced slabs and commercial and industrial buildings being built on piled rafts. The Victorians often didn’t use this method of construction for foundations and instead used to build shallow footings out of a course of 5-6 bricks in a ‘pyramid’ shape spreading the load across the ground and in some cases the footings are no more than 200mm’s deep. Many of these Victorian buildings have stood the test of time and we are often asked “with such shallow foundations, why hasn’t my house fallen down yet?” There is no simple answer to this but the loads from a house typically weighing around 100 tonnes doesn’t actually impose huge forces to the ground as the weight is distributed evenly across the structure and the ground.

The problems with the shallow foundations arise due to the shrinkage and heave of the clay soils that are found across London and the South East. Subsidence is a major issue within the South East of England as clay is prone to subsidence which is the shrinkage of the soil and the not so common heave which is the swelling of the soil. This structural defect is usually dealt with by your insurance company of which Newman’s are highly regarded for as a skilled contractor offering piling underpinning and superstructure repairs for a network of insurance companies.

If you are thinking of purchasing or renovating a Victorian property we are able to help with our range of surveys and structural repairs, there isn’t much we haven’t seen or designed and installed repair programmes for so be sure to visit us and get in contact for a consultation.

Be sure to read our new articles coming soon.

Read More

What is a cavity Wall? And why are they Used?

Cavity Walls

A cavity wall is a fairly modern method of construction used when constructing buildings, it give a gap between the two skins of masonry. The construction of cavity walls began in the late 20th century to prevent the penetration of moisture through the outer skin of the building into the inner leaf of the wall. During early construction of cavity walls the masonry panels were tied using bricks placed end on into the inner skin until a metal wall tie was developed.

Cavity Wall Construction
Cavity Wall Construction

The Introduction of the Iron Fishtail.

Cavity construction had begun in the early 1900’s but with a huge house building boom in Britain in the 1930’s cavity wall construction was the main method adopted due to the speed and ease of construction and this new method prevented damp penetration between the two skins. Wrought and cast iron ‘fishtail ties’ were developed and rapidly deployed as a structural component tying the two skins together.

Corroded Fishtail Wall Tie
Corroded Fishtail Wall Tie

The Problem.

Wrought and Cast Iron are prone to corrosion, this causes them to fail weakening the structure and putting the property at risk of collapse. The fishtail ties corrode and there are many factors that cause the corrosion mainly being oxidisation of the iron causing expansion of the tie which lifts the bed joint it is bedded in causing horizontal cracking and loss of strength allowing lateral movement. Other factors such as aggressive mortar like those found in black ash mortar accelerate corrosion as well as the porous and weak Lime sand mortar often used in London. The problem is rapidly accelerated in coastal areas found across the South East coast due to the high content of salt water present. As well as corrosion tie density and spacing is also a cause of concern as it is often found that there are inadequate wall ties within the masonry panel especially at the weakest points around window and door openings.

Wall Tie Installation

 

The Solution.

Help is at hand with the specialist Twistfix CD Remedial Wall tie, of which Newman’s are approved designers and installers of this type of repair specification. A specialist remedial wall tie programme will be designed by our team of surveyors and engineers who carry out a site investigation and will determine the appropriate course of action offering a cost effective repair solution. The existing failed wall ties are covered with a specialist designed sleeve that encompasses the corroded tie in a resin preventing further corrosion. Remedial ties are installed across the effective areas conforming to the latest British Standards restoring the structural integrity of the property and tying the two skins of masonry together.

Read More