Newman’s are now into our busiest month of this current year with our Structural Repairteam’s extremely busy repairing failed masonry across the country. We’re happy to report our Bristol operation has grown rapidly with orders coming in across the South West and Wales.
Wall Tie Replacementand Structural Repair works have been successfully procured from our Head Office in Hammersmith, West London to a plot of 11 retirement bungalows in shepherds bush suffering from Horizontal Cracking and Vertical Cracks.
Newman’s were called upon by a home owner in East London who had discovered diagonal cracking and substantial rotation to the brick arch lintels to the rear of the property causing substantial concern.
With our Head office in Hammersmith, West London a surveyor was able to attend site on short notice to carry out a Structural Survey and diagnose the cause of cracking.
Lintel Failure was diagnosed after the replacement of the original load bearing timber frames which caused the lintel above the frame, supported mainly by the timber window, to drop.
In order to restore the masonry TwistfixBed Joint Reinforcement was installed to create masonry beams within the structure which distribute the structural loads across the masonry and create a reinforced beam alleviating the need for all the lintels to be rebuilt.
In very few instances it is not possible to save the lintel as the damage is to severe and a rebuild is the only option. Luckily for our client all of our technicians are time served in both traditional and modern methods of masonry repair.